To Do List



This is a small list of projects (automotive related) that I need to get cracking on. These are not yet ordered, but I have started collecting them here so I have is available at all times and as a sorry reminder of how much is yet to be done. The restaurant order wheel is something I have been thinking of adding to the garage. The most important project at the front of the list and all the rest. Might actually be a cool thing to have, but yet that might be another project to the list...
To Do List
GTSparkplugs Header
Click for Contact Page Click for Contact Page

The Ripper (1965 Mustang Fastback)

Put on the Fays2 Watts Linkage
Complexity : Medium, Time : Medium

Check and put on Bear Tracker Bump Steer Kit
Complexity : Low, Time : Medium

Clean and Check Front Brakes Suspension
Complexity : Low, Time : Medium

Make Coil Over Shock Brackets to Replace Koni's
Complexity : Low, Time : Medium


RCR-GT40


Finish Dash Harness
Complexity : Low, Time : Low

Start Chassis Harness
Complexity : Low, Time : High

Fix Fuel Tank Pick Up threads/flange
Complexity : Low, Time : High

Move Front Sway Bar to inside foot box
Complexity : Low, Time : Med

Finish Plumbing for Cooling
Complexity : Low, Time : Med

Install Pedal Assembly
Complexity : Low, Time : Med

Install Battery Box in Footwell and Wire
Complexity : Low, Time : Med

Put together clutch and starter
Complexity : High, Time : Med

Install Exhaust Heat Shielding
Complexity : Low, Time : Low

(MORE LATER)

VSE Cobra

Bolt Down Seats and harnesses
Complexity : Low, Time : Low

Fix Oil Leak from Accu-Sump
Complexity : Low, Time : Low

Hmm, more stuff here, but off hand can't think of it now.


Sunbeam Tiger


Pull Rear Suspension
Complexity : Low, Time : High

Get Dana 44 built with 9" Housing ends (Curries will do work)
COMPLETED (New Ford 9" installed)
Complexity : Low, Time : Low

Pull Engine and Trans
Complexity : Med, Time : High

Pull Front Suspension (Clip)
Complexity : Low, Time : High

Mock Install new Front Suspension
Complexity : Low, Time : High

Remove Brake/Clutch and Slave Masters and related
Complexity : Low, Time : Med

Gut  Engine compartment
Complexity : Low, Time : High

Install Wilwood Pedal Box
Complexity : Med, Time : Med

Mock Install new Front Suspension With Engine
Complexity : Low, Time : High

Fix Engine Oil Pan when it his Steering Rack
Complexity : Low, Time : High

Modify Transmission tunnel for 1350 U-Joints
Complexity : Med, Time : Med

Mock Up Transmission and Tilton Parts
Complexity : Low, Time : Low

Add Rear Sway Bar Mounting points
Complexity : Low, Time : High

Update Panhard Bar to MKII style (Welding Axle and Chassis work needed)
Complexity : Low, Time : High

Remove Tiger Fuel Tanks and replace with single Fuel Cell
COMPLETED Removal and Cell Brackets
Complexity : Low, Time : Med

Rewire Car with New Harness
Complexity : Med, Time : Med

Install new dash and gauges
Complexity : Low, Time : Med

Porsche Boxster


Change Spark Plugs
COMPLETED
Complexity : Low, Time : Med

Excursion


Video and Install Tymar Intake System
Complexity : Low, Time : Med


Garage Work


Mount Order Wheel
Complexity : Low, Time : Low

Mount Paper Towel Racks
COMPLETED
Complexity : Low, Time : Low

Mount Hand Cleaner Dispenser
COMPLETED
Complexity : Low, Time : Low

Clean the place up and organize Well Completed a bit, Bench and Dirt Cleaned, More to go!
Complexity : Low, Time : Med
The more I think of this but better I like the idea. A glaring stare at the WHEEL OF PROJECTS might add to some motivation to get the crap done. A blinking red light should also be placed on the wheel and turned on when any projects are unfinished. Likely will not need a switch.