To Do List
This is a small list of projects (automotive related) that I need to get cracking on. These are not yet ordered, but I have started collecting them here so I have is available at all times and as a sorry reminder of how much is yet to be done. The restaurant order wheel is something I have been thinking of adding to the garage. The most important project at the front of the list and all the rest. Might actually be a cool thing to have, but yet that might be another project to the list...
The Ripper (1965 Mustang Fastback)
Put on the Fays2 Watts Linkage
Complexity : Medium, Time : Medium
Check and put on Bear Tracker Bump Steer Kit
Complexity : Low, Time : Medium
Clean and Check Front Brakes Suspension
Complexity : Low, Time : Medium
Make Coil Over Shock Brackets to Replace Koni's
Complexity : Low, Time : Medium
RCR-GT40
Finish Dash Harness
Complexity : Low, Time : Low
Start Chassis Harness
Complexity : Low, Time : High
Fix Fuel Tank Pick Up threads/flange
Complexity : Low, Time : High
Move Front Sway Bar to inside foot box
Complexity : Low, Time : Med
Finish Plumbing for Cooling
Complexity : Low, Time : Med
Install Pedal Assembly
Complexity : Low, Time : Med
Install Battery Box in Footwell and Wire
Complexity : Low, Time : Med
Put together clutch and starter
Complexity : High, Time : Med
Install Exhaust Heat Shielding
Complexity : Low, Time : Low
(MORE LATER)
VSE Cobra
Bolt Down Seats and harnesses
Complexity : Low, Time : Low
Fix Oil Leak from Accu-Sump
Complexity : Low, Time : Low
Hmm, more stuff here, but off hand can't think of it now.
Sunbeam Tiger
Pull Rear Suspension
Complexity : Low, Time : High
Get Dana 44 built with 9" Housing ends (Curries will do work) COMPLETED (New Ford 9" installed)
Complexity : Low, Time : Low
Pull Engine and Trans
Complexity : Med, Time : High
Pull Front Suspension (Clip)
Complexity : Low, Time : High
Mock Install new Front Suspension
Complexity : Low, Time : High
Remove Brake/Clutch and Slave Masters and related
Complexity : Low, Time : Med
Gut Engine compartment
Complexity : Low, Time : High
Install Wilwood Pedal Box
Complexity : Med, Time : Med
Mock Install new Front Suspension With Engine
Complexity : Low, Time : High
Fix Engine Oil Pan when it his Steering Rack
Complexity : Low, Time : High
Modify Transmission tunnel for 1350 U-Joints
Complexity : Med, Time : Med
Mock Up Transmission and Tilton Parts
Complexity : Low, Time : Low
Add Rear Sway Bar Mounting points
Complexity : Low, Time : High
Update Panhard Bar to MKII style (Welding Axle and Chassis work needed)
Complexity : Low, Time : High
Remove Tiger Fuel Tanks and replace with single Fuel Cell COMPLETED Removal and Cell Brackets
Complexity : Low, Time : Med
Rewire Car with New Harness
Complexity : Med, Time : Med
Install new dash and gauges
Complexity : Low, Time : Med
Porsche Boxster
Change Spark Plugs COMPLETED
Complexity : Low, Time : Med
Excursion
Video and Install Tymar Intake System
Complexity : Low, Time : Med
Garage Work
Mount Order Wheel
Complexity : Low, Time : Low
Mount Paper Towel Racks COMPLETED
Complexity : Low, Time : Low
Mount Hand Cleaner Dispenser COMPLETED
Complexity : Low, Time : Low
Clean the place up and organize Well Completed a bit, Bench and Dirt Cleaned, More to go!
Complexity : Low, Time : Med
The more I think of this but better I like the idea. A glaring stare at the WHEEL OF PROJECTS might add to some motivation to get the crap done. A blinking red light should also be placed on the wheel and turned on when any projects are unfinished. Likely will not need a switch.